|
|
|
1. PERIOD 2000-2006. GIPUZKOA OBJECTIVE
Nº 2:
LEVEL OF EXECUTION OF AXES, MEASURES AND PROJECTS. |
|
|
|
|
|
|
|
|
|
|
|
Measure 2.1: Improving existing infrastructures, supplying water to the local population and local industry, sanitation and sewage processing |
|
|
|
|
|
|
|
|
|
|
|
Sanitation in Ordizia
Body Responsible: Gipuzkoa Provincial Council Department for Sustainable Development
Sanitation in the municipality of Ordizia, water-cleansing operations on the River Oria and construction of water collection units to send the water to the sewage plant at Legorreta.
|
|
|