|
|
|
1. PERIOD 2000-2006. GIPUZKOA OBJECTIVE
Nº 2:
LEVEL OF EXECUTION OF AXES, MEASURES AND PROJECTS. |
|
|
|
|
|
|
|
|
|
|
|
Measure 5.1: Rehabilitating and fitting out urban areas |
|
|
|
|
|
|
|
|
|
|
|
Development work along the River Molinao (Pasaia)
Body Responsible: Pasaia Town Hall
Restoration and development work (building a park) on wasteland (docks area in rehabilitation) on the bank of the River Molinao, with many derelict factories in a poor state of repair and lacking basic production facilities.
|
|
|