The main spheres of activity are integral
urban and industrial waste management, reinforcement of infrastructures
in relation to pollution control and monitoring, protection and
regeneration of the natural surroundings, and also the restoration
of environmentally deteriorated areas.
In terms of water resources, the axis includes measures for
improving the water supply, as well as sanitation and sewage
processing.
MEASURES
Measure 2.1: Improving existing infrastructures,
supplying water to the local population and local industry, sanitation
and sewage processing.
Sanitation in Ordizia
Sanitation in the municipality of Ordizia, water-cleansing
operations on the River Oria and construction of water collection
units to send the water to the sewage plant at Legorreta.
Body Responsible :
Gipuzkoa Provincial Council
Department for Sustainable Development
Herrera-Loiola Water Collection Unit (Donostialdea
sanitation area)
Faecal waters from the Donostialdea-Este area to be sent via
the basin of the River Oiartzun to the sewage plant planned for
the Urumea basin.
Body Responsible :
Gipuzkoa Provincial Council
Department for Sustainable Development
Sewer in Bergara
Construction of a sewer to collect sewage from the town of Bergara until the future sewage plant is built as well as various branches.
Body Responsible :
Gipuzkoa Provincial Council
Department for Sustainable Development
Sewer in the Central Oria area
Construction of an interceptor network to collect assimilable industrial and urban sewage from ten towns in the central Urola area.
Body Responsible :
Gipuzkoa Provincial Council
Department for Sustainable Development
EDAR (sewage treatment plant) in the Central Oria area
Designed to treat sewage from the towns in the Central Oria area, providing a service for the equivalent of 150,000 people. It includes low-load biological treatment and the removal of nutrients.
Body Responsible :
Gipuzkoa Provincial Council
Department for Sustainable Development
|