It includes local development initiatives,
rehabilitating and fitting out urban areas, improvements in urban
transport infrastructure, development of tourist and cultural
infrastructures, and conservation and rehabilitation of artistic
and cultural heritage.
MEASURES
Measure 5.1: Rehabilitating and fitting
out urban areas
Bicycle network in Gipuzkoa
Construction of a network of cycle paths over the entire province
of Gipuzkoa.
Body Responsible :
Gipuzkoa Provincial Council
Department for Sustainable Development
Restoration of the old quarter of San Martín
(Ataun)
Restoring the old quarter of the town of Ataun as a meeting
place for local people, and placing a ban on through traffic..
Body Responsible :
Ataun Town Hall
Bidegorri (cycle path) along the old former
railway line (Azkoitia)
Construction of a cycling and walking route along the old Urola
railway. Urola.
Body Responsible :
Azkoitia Town Hall
Improved access: escalator (Eibar)
Improved access using escalators to link up the busiest parts
of the town and those which are less accessible due to the complex
orography of local terrain.
Body Responsible :
Eibar Town Hall
Street works (Ikaztegieta)
Landscaping to improve the streets, better sign-posting and
widening of the pavements along the old N-1 road through the
town centre, to prevent urban degradation and a loss of quality
of living space and the immediate surroundings.
Body Responsible :
Ikaztegieta Town Hall
Cycle path (Oiartzun)
Building of a cycle path (bidegorri) along a disused mining
railway, in an area for tourists and leisure facilities for the
surrounding area.
Body Responsible :
Oiartzun Town Hall
Development work along the River Molinao
(Pasaia)
Restoration and development work (building a park) on wasteland
(docks area in rehabilitation) on the bank of the River Molinao,
with many derelict factories in a poor state of repair and lacking
basic production facilities.
Body Responsible :
Pasaia Town Hall
Improvements in Amara Park
Renovating Amara Park, by increasing the green spaces and new trees. It is especially designed to be used by children, with play areas and a relaxation area with new street furniture.
Body Responsible :
Donostia-San Sebastián Town Hall
Doing up the Calle Fuenterrabía
Making improvements to all the features of the layout of the street, including new wider pavements, removing urban barriers, refurbishing underground services and planting trees.
Body Responsible :
Donostia-San Sebastián Town Hall
Fitting out the pavements in the Avenida de la Libertad
Renovating the streetlights, traffic lights, power supply network and rainwater pipes, surfacing the pavements (on the odd side) and asphalting the road.
Body Responsible :
Donostia-San Sebastián Town Hall
Measure 5.3: Infrastructure and support
for social integration in urban environments
Multi-purpose unit (Zegama)
Refurbishment of a building to be used as a clinic and a day
centre / centre for pensioners, with leisure and medical facilities.
Body Responsible :
Zegama Town Hall
Measure 5.5: Infrastructures for tourism
and culture
Sign-posting and improvement of pathways
Economic assistance for Town Halls to erect signposts and improve
their pathways.
Body Responsible :
Gipuzkoa Provincial Council
Institutional and Social Relations Department
Txara II Cultural Centre (Donostia-San Sebastián)
Refurbishment of a building for cultural activities.
Body Responsible :
Donostia-San Sebastián Town Hall
Mirandaola Interpretation Unit (Legazpi)
Refurbishment of a former industrial facility to be used as
an interpretation unit for local crafts and the Mirandaola nature
park by respecting the industrial appearance of the building,
whilst simultaneously improving and enhancing the quality of
the nature park’s facilities in terms of tourism and culture.
Body Responsible :
Legazpi Town Hall
Reconversion of the Aizpea Mineworks (Zerain)
Reconversion of some disused iron mines in a tourist area (improved
access, sign-posting and work on the galleries) as part of the
Ruta del Hierro or Iron Route and to enhance “green” or
rural tourism in Gipuzkoa.
Body Responsible :
Zerain Town Hall
Extension of Okendo Cultural Centre
New gallery and auditorium, improvements in the library facilities and new amenities for young people and children in the old Cultural Centre.
Body Responsible :
Donostia-San Sebastián Town Hall
Measure 5.6: Conservation and rehabilitation
of historical, artistic and cultural heritage
Rehabilitation of historical, artistic and
cultural heritage.
Restoration of the basilica dome at the Loiola sanctuary, rehabilitation
work on the Santa Teresa de San Sebastián convent, and
restoration of religious heritage.
Body Responsible :
Gipuzkoa Provincial Council
Cultural Affairs Directorate General
Local Museum, Torre Santa María (Zarautz)
Rehabilitation and archaeological work on the Torre Santa María
as a local museum, acquisition of funds and the means to carry
out the project.
Body Responsible :
Zarautz Town Hall
Renovating the Victoria Eugenia Theatre
Improving the basic structures and renovating the outside; fitting it out with equipment; renovating its technological systems and creating new rooms for various uses.
Body Responsible :
Donostia-San Sebastián Town Hall
Measure 5.7: Infrastructures and social
facilities
Social and cultural facilities for young
people
Providing a wide range of basic facilities for young people,
to encourage participation and cultural interaction.
Body Responsible :
Gipuzkoa Provincial Council
Institutional and Social Relations Department
Children’s Teaching Centre (Ibarra)
Refurbishment of a building for crèche facilities and
regeneration of the area round the crèche.
Body Responsible :
Ibarra Town Hall
Measure 5.9: Professional training centres
and local development agencies
Construction of a cyber-centre (Bidasoa)
Construction of a multi-media centre to promote new information
and communication technology (NICT) – it may also be used
as an NICT Training Centre by local residents and businesses.
Body Responsible :
Bidasoa activa - Bidasoa bizirik (Bidasoa Area Development Centre)
Refurbishment of an occupational centre (Hernani)
Refurbishing and equipping of existing centres for use as training
centres and computer science centres.
Body Responsible :
Hernani Town Hall
|